Pneumatic Ship Unloaders – Misurata Port

GTIS assembled, installed, and commissioned two VIGAN pneumatic ship unloaders at Misurata Port, Libya, each with a capacity of 300 T/H.

Confidential
Project Value
10 months
Duration
600 T/H (2x 300 T/H)
Capacity
5
Client Rating

Project Overview

At Misurata Port, GTIS carried out the assembly, installation, and commissioning of two VIGAN pneumatic ship unloaders with a total capacity of 600 T/H. The project ensured seamless integration with port infrastructure, improving the efficiency of bulk material handling operations.

Key Features

Reception and unloading of heavy equipment
Assembly of steel structures and mechanical components
Installation of pneumatic circuits and electrical systems
Comprehensive I/O testing and commissioning

Project Benefits

Boosted Port Efficiency

Faster and more reliable unloading to support growing trade.

Seamless Integration

Designed to fit within Misurata Port’s existing infrastructure.

Project Process

1

Equipment Reception

2 months

Handling and unloading of heavy components on-site.

2

Assembly & Installation

6 months

Assembly of steel structures and pneumatic systems.

3

Testing & Commissioning

2 months

Comprehensive I/O testing and operational handover.

Project Gallery

Pneumatic Ship Unloaders – Misurata Port - Image 1
1 / 5
Pneumatic Ship Unloaders – Misurata Port - Image 2
2 / 5
Pneumatic Ship Unloaders – Misurata Port - Image 3
3 / 5
Pneumatic Ship Unloaders – Misurata Port - Image 4
4 / 5
Pneumatic Ship Unloaders – Misurata Port - Image 5
5 / 5

Project Details

LocationMisurata, Libya
ClientPort Authority of Misurata
Completion2021-06-20
Project ManagerMr. Othman KHALIL
Team Size40 people
CategoryPort Infrastructure

Technical Specifications

Equipment2 pneumatic ship unloaders (VIGAN)
Capacity300 T/H each, 600 T/H total
LocationMisurata, Libya
ServicesAssembly, installation, commissioning

Interested in Similar Project?

Contact our team to discuss your requirements and get a customized solution.

+212 667 060 089
contact@gtis.com
www.gtis.com

Related Projects

Explore other successful projects in our portfolio

Feed Production Facility – Al Noor Al Tayeb
Completed
5
Turnkey feed production plant with 20 T/H capacity

Feed Production Facility – Al Noor Al Tayeb

Benghazi, Libya
2023
Confidential
Agro-Industrial Production Facility – Had Soualem
Completed
5
40 T/H flaking & ruminant feed line

Agro-Industrial Production Facility – Had Soualem

Had Soualem, Morocco
2022
Confidential
Port Salif Grain Storage Terminal
Completed
5
280,000-ton wheat storage facility

Port Salif Grain Storage Terminal

Port Salif, Yemen
2020
Confidential